Yes, most screen enclosures and any sunroom conversion in St. Petersburg require a permit. A $7,500 permit exemption exists under Florida law, but it excludes flood zones and any structural, electrical, plumbing or mechanical work, so you need formal approval before you start. Applications go through the City of St. Petersburg’s ePlan system or the Pinellas County Access Portal, depending on where your property sits.
Which permit types apply: aluminum structure, screen room, pool enclosure, or building permit?
Not every screen project is filed the same way, and picking the wrong permit type is one of the fastest ways to stall your application. Pinellas County lists an “Aluminum Structure” subtype specifically for screen rooms and pool enclosures, separate from a full building or addition permit. Which one you need depends on what you are actually building.
- Screen room or pool cage: filed as an Aluminum Structure permit when you are adding an open-air, unconditioned enclosure over a patio or pool.
- Sunroom conversion: filed as a building permit or addition when the space becomes conditioned, insulated, or otherwise turned into livable square footage.
- Trade work: electrical, plumbing or mechanical additions inside the enclosure need their own trade permits alongside the structural one.
Jurisdiction matters too. Some St. Petersburg addresses fall under the city’s own building department, while unincorporated pockets nearby fall under Pinellas County. Before you file anything, confirm which one applies to your parcel through the City of St. Petersburg’s building and permitting pages, which also outline the ePlan digital submittal process the city uses for review. Once your permit is issued, expect at least one framing or structural inspection followed by a final inspection before the enclosure is signed off and closed out.
Understanding HB 803’s $7,500 exemption: what homeowners must know
Florida’s HB 803 gave Pinellas County a formal process for exempting small residential jobs from permitting, effective July 1, 2026. It is a narrower carve-out than most homeowners assume.
$7,500 or less in work value is the qualifying threshold for a single-family dwelling under Pinellas County’s exemption guidance, and it applies only outside flood hazard areas, meaning a routine rescreen on a standard lot can qualify while the same job a block away in a flood zone cannot.
The exclusions matter more than the dollar figure:
- Any property located in a mapped flood hazard area is excluded regardless of project cost.
- Structural work, including reframing, footing repairs or panel replacement that changes the enclosure’s design, is excluded.
- Electrical, plumbing or mechanical work of any kind is excluded, even minor additions.
- Window, door and roof modifications are typically excluded from the exemption as well.
Do not assume you qualify just because your quote came in under the threshold. Get the exemption confirmed in writing before work starts, and keep your contractor’s itemized estimate on file in case the county asks for it later.
Step-by-step application checklist: documents to prepare for ePlan / Access Portal
Most permit delays trace back to missing paperwork, not the review itself. Here is what to have ready before you submit through ePlan or the Access Portal.
- Current signed and sealed survey, dated within the last five years, showing your property boundaries and existing structures.
- Site plan marking the exact footprint of the new or modified enclosure relative to setbacks and existing structures.
- Two complete sets of construction plans, or a single digitally signed PDF submittal if filing electronically.
- Sealed engineering plans when the project involves structural changes or a conditioned-space conversion.
- Product approval documents for screening material, framing and any impact-rated components used in the design.
- Notice of Commencement, recorded once your project value crosses the threshold that triggers it.
- Signed contract with your licensed contractor, or an owner-builder affidavit if you are pulling the permit yourself.
Pinellas County’s applying-for-a-permit guidance confirms that most exterior work, including screen rooms and pool enclosures, falls under residential permit types that require these exact documents. The most common rejection reason is an outdated or missing survey, followed closely by engineering plans that were not properly signed and sealed. Homeowners who are new to this process often benefit from reviewing a full permit checklist before their first submission.
Pro Tip: Scan and label your documents clearly before uploading. A survey filed as “IMG_4521.pdf” gets flagged for review just as often as one that is actually missing.

Costs and timeline: what to expect for review, permits, and inspections
Review times vary by workload at the department, but a straightforward screen enclosure permit typically moves faster than a sunroom conversion because it involves fewer trades and no habitable-space calculations. Expect the simpler Aluminum Structure permit to clear review in less time than a building permit that touches electrical, insulation and egress requirements.
Fee amounts depend on your declared project value, the number of trade permits attached, and how complex the plan review turns out to be. A basic pool cage rescreen with no structural changes usually needs a single trade permit, while a full sunroom conversion can require separate electrical, mechanical and building permits reviewed together.
- Submit a complete document package the first time; incomplete submittals reset the review clock.
- Confirm your flood zone status before applying, since it changes both your exemption eligibility and your documentation needs.
- Work with a licensed contractor who has filed in your jurisdiction before, since familiar submittals move through review faster.
When you need sealed engineering plans or flood-zone documentation
Some projects trigger a higher level of scrutiny no matter how small they seem. Sealed engineering plans become necessary when you are replacing structural framing, converting an open enclosure into conditioned or habitable space, or making any change that affects the roof or load-bearing elements.
Flood zone status is the other trigger that catches homeowners off guard. The HB 803 exemption does not apply inside mapped flood hazard areas, and projects there may also need elevation certificates or additional FEMA documentation depending on the scope of work, a detail confirmed in Pinellas County’s exemption guidance.
- Structural framing replacement or modification always requires sealed plans.
- Conditioned-space conversions require energy and egress calculations reviewed as a building addition.
- Flood hazard properties lose exemption eligibility and may need extra elevation documentation.
Florida’s building code also allows an alternative screen enclosure design method that identifies specific screen panels engineered to be removed or cut during high wind events, provided the engineering documents state this explicitly. If your project involves this kind of wind-load design, your plans need to spell it out, which is worth understanding before you commit to a particular wind rating approach for your enclosure.
How a local, permit-aware contractor helps you get it right
A contractor who has filed permits in Pinellas and Hillsborough counties knows which documents the review staff actually want to see, not just what the checklist says. That familiarity saves homeowners from the resubmission cycle that eats weeks off a project timeline.
A contractor experienced in screen enclosures and pool cages across the Tampa Bay area typically uses an in-house crew rather than subcontractors for site measurements, estimates, and repairs. When a job needs sealed plans, we coordinate with the engineer directly instead of leaving the homeowner to manage that piece alone.
Before you hire anyone for permit-related work, ask for their state license number, proof of insurance, and an example of a permit-ready estimate. A contractor who hesitates on any of those three is worth a second look.

If you want help: Rescreen Rescue permit-aware services and how to contact
Getting a screen enclosure permit-ready takes more than filling out a form. It means having a contractor who prepares the documentation the reviewer will actually ask for, so your project does not sit in a queue waiting for a missing survey or an unsigned plan.

Rescreen Rescue serves homeowners across St. Petersburg, Pinellas and Hillsborough counties with services built around this exact problem:
- Full Rescreen for enclosures that need every panel replaced, with documentation ready for permit review when required.
- Pool Cage Restoration for structural repairs that typically call for sealed engineering plans.
- Screen Repair and Hardware Replacement for smaller jobs that may fall under the HB 803 exemption once flood zone status is confirmed.
We provide contractor-signed estimates that match what permitting staff expect to see, coordinate with engineers when sealed plans are required, and schedule inspections once the permit is issued. Visit our services page to get a free estimate started.
Sources
- Applying for a building permit — Pinellas County
- Building & Permitting — City of St. Petersburg
- Florida Building Code: Screen enclosures alternative language
FAQ
Do you need a permit for a screen enclosure in Florida?
Yes, in most cases, though the specific rules depend on your county and the project’s value. Florida’s HB 803 allows a limited exemption for work under $7,500 in Pinellas County, but it excludes flood zones and structural or trade work.
What are the requirements for screen enclosures under the Florida Building Code?
The Florida Building Code allows an alternative design method for screen enclosures that identifies specific panels engineered to be removed during high wind events. Any design using this method must state that detail explicitly in the sealed engineering documents.
What are the legal requirements for pool enclosures in Florida?
Pool enclosures in Pinellas County are filed as an Aluminum Structure permit, a residential permit subtype separate from a general building permit. Structural changes, flood zone locations and any electrical or mechanical additions require full permitting rather than the small-project exemption.
How much does it cost to put a screened enclosure over a pool in Florida?
Permit fees and total project costs depend on your declared project value, the number of trade permits involved and the complexity of your design, so there is no single published figure that applies to every property. Rescreen Rescue provides free estimates for pool cage projects across St. Petersburg, Pinellas and Hillsborough counties, which is the most reliable way to get a number specific to your home.